The High Pressure Hydrogen Laboratory (HPHL), formerly known as Fracture Toughness Testing Facility (FTTF), is a laboratory used for high pressure …
This EEC covers reconfigure ceiling in 717-5N to expose sprinkler system.…
Replace the old secondary 15kV cables on T1 transformer at 151-1C.…
M-DCF-H-13130, Revision 1 will replace two (2) existing flanged connections that currently have instrument tubing with solid blind flanges.…
The proposed activity is to assist Non-destructive Assay (NDA) group with radiological assays and to relocate the segregated solvent filters from t…
Provide labor, material, and services to fallen trees and brush at six environmental monitoring station locations: Lower Three Runs (L3R) -1A, L3R-…
Activity is to replace the current trailer 782-3G with a new trailer in approximately the same location.…
This EEC includes the removal and replacement of an awning from Building 292-2F.…
CX-032542: Sinkhole Investigation and Repair Adjacent to Materials Access Area Entry Trailer, K-Area
Sinkhole investigation and repair adjacent to Materials Access Area Entry Trailer in K Area.…