703-47A Replace (4) doors.…
Provide Power to Buildings 706-H, 706-8H and 706-6H.…
The proposed work activity is to replace the fan belts, bearings, and sheaves due to high vibrations on the two E5 fans in Building 292-2F.…
Replace the exterior double doors located on the eastside of building 704-3N.…
Roof Repairs at 713-N.…
Install UW Drops in New Cubes in 704-1N Rm. 177. / Install electrical service to new cubicles.…
Installation of two tornado shelters inside N-Area. One will be West of 704-1N and the other will be South of 731-2N.…
Receiving Basin Off-Site Fuel (RBOF) Cask Pad Containment Activities…
701-1K Locker Room Renovation Including New Tile Flooring, Painting, etc.…
Install Permanent Diesel Generator at 702-F.…