Replace/Upgrade Fire Alarm Control Panel, Modify Fire Alarm and Detection System and Fire Sprinkler Riser in Bldg. 221-33F.…
Install Telecommunications to 704-76E.…
Utilization and modification of the second floor of Building 706-3F to perform engineering classified computing tasks to support NNSA missions…
This activity involves loading hydrogen isotopes, hydrogen (protium) and deuterium into sealed vessels containing various hydride-forming metals fr…
Install VTC system in 704-N room 120.…
Nozzle 1 in the 291-H stack is plugged and will be cleaned by flushing air through it.…
This EEC covers planning activities for F/H Lab Tank Cells A, B, C, and D deactivation.…
Install Telecommunications to 704-76E.…
Cell Covers for underground locations at 105-C such as the Storage Tank Room, Heat Exchanger plugs, cooling water effluent head plugs, emergency pu…
Seal Outside Holes at 701-1A.…