The awning to the 772-F South entrance was damaged during Hurricane Helene. The Facility determined it is no longer needed and will be permanently …
Install antenna on the roof of building 210-Z and install radio equipment inside control room for two-way radio communication between the Saltstone…
The EEC covers removal and replacement of carpet where needed in 711-1N.…
Subcontractor will provide roof repairs at 702-A.…
This EEC covers various general internal and external renovations and modifications for Building 705-A, such as flooring/cove base replacement, cei…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Clemson University to design, develop, prototype, and validate a nov…
The Department of Energy is proposing to provide funding to the State of South Carolina Energy Office (SC Energy) to design and install an approxim…
Material Science and Technology Group is using a Brother HS-70A Electric Discharge Machine (EDM) (submerged wire type) for sectioning tritium expos…
Perform mercury analysis using a Milestone Direct Mercury Analyzer (DMA-80)…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to GE Vernova Operations LLC. (Vernova) to for development of a compute…