Repair 730-N storm damage.…
This EEC covers the sealing and coating the inside and outside around the base of building 717-1N (Boilermakers Shop).…
There are four heat exchangers on the roof of 105-K that are no longer in use. The facility has been asked to remove these along with surrounding i…
This R and D activity will evaluate the use of dry electrolyte in an electropolishing device.…
One monitoring well, TNX-076-D, is being installed to provide additional definition of a known Volatile Organic Compound (VOC) groundwater plume ne…
F-Area will perform activities to assist in the evaluation and planning of possible mitigation activities to address suspected rainwater intrusion …
Subcontractor will provide roof repairs for 705-H.…
This EEC addresses planned renovation activities within 704-L.…
Replacement of 66 roof in 105-L…
PBI-25 Remove Out of Service Overhead Supervisory Control and Data Acquisition (SCADA) Lines and Accessible Poles from Station 52 to R-Area, from R…