In order to support the NNSA mission, B-Area Laboratories is resuming beryllium analysis capabilities using optical fluorescence. It is essential t…
Dominion Energy (DESC) proposes to use a helicopter for aerial broadcast application of a herbicide mix on selected 115-kV and 230-kV electricity t…
A subcontractor will convert radioactive depleted uranium oxide (DUO) to depleted uranyl nitrate (DUN) via dissolution of DUO in nitric acid soluti…
Replace underground water, air, and steam utility piping to new above ground utility piping at H Tank Farm East Hill.…
Subcontractor to empty propane from tanks 1 and 2 at 754-11A.…
730-B Remove Lektriever in room No. 212.…
Install UW (Universal Wiring) drops for cubicle replacement in 730-1B 3RD floor.…
The purpose of this activity is to perform gate checks and clear weeds and other debris from the conduits at Par Pond Dam and Steel Creek Dam (L-La…
701-4G Remove/replace flooring.…
Mass Spectrometer 20 valves A2 and M2 are leaking and need to be replaced. These valves provide argon to the MS-20 system. Though they are used for…