The existing standby power system is original from the 1950's and has reached the end of its expected life. The standby diesel generator and fuel t…
Evaluate and Correct Process Well 905-108H.…
707-3N and 707-4N Execute Post Civil work for 2 tornado shelters.…
731-4N Install Fans Inside Warehouse to Circulate Air.…
Relocate bench grinder to hot work area. Reroute conduit, power wires and install new local disconnect. Relocate belt sander into hot work area. In…
Replace asbestos containing insulation (clamshell) on strainer on the Chilled Water System, and reinsulate (with non-asbestos), K-Assembly Area.…
766-H Renovate classrooms 1043,1045 and 1047. Remove items from wall, patch and prep walls to apply semi-gloss paint, remove carpet, prep floors, i…
This activity is the operation of analytical polymer characterization equipment in AMC Lab 137 - the Additive Manufacturing Support Laboratory, spe…
This activity will cover the synthesis and development of advanced materials using conventional synthetic methods. Such materials will include meta…
Three commercial fixative products will be tested by ASTM methods to confirm their suitability for D and D work in the DOE complex. ASTM methods wi…