Characterization of P-Area Groundwater Operable Unit plumes is required. In Fiscal Year 2026, this will include drilling 18 soil borings to collect…
Construction to repair to perform building renovations in 778-2A…
The U.S. Department of Energy (DOE) proposes to analyze fission gas from samples of high burnup boiling water reactor spent fuel rods (BWR rods), a…
Remove existing epoxy coating from 681-3G traveling screen deck and recoat.…
Cool Seal Roof 716-8B.…
Install WIFI at 735-2B.…
Update all lighting fixtures to LED throughout the facility at 716-N.…
The scope of this activity will be to install blanks to Vessel 6.8E and 7.7E for cooling water and steam at 221-H. Blanking cooling water and steam…
Operation and maintenance of the LECO Carbon/Sulfur. This method determines the concentration of carbon/sulfur in small lab samples.…
Venting gas cylinder bottles for the disposal of lecture bottles thru recycling in A-Area hoods.…