Graphene oxide nanoribbons will be mixed in with thermoplastics when appropriate. Printing with conventional commercial FLD filaments is also detai…
Remove wallpaper/prep/paint on the west side wall at the North entrance of 704-C.…
Replace door handle on east door of 211-8H.…
A new telephone is needed in 105-L near the purification trailer space door. The existing phone lacks some of the needed emergency response capabil…
Installation of new metal building in the former location of 773-69A and 773-70A.…
Install emergency lighting in 772-7B.…
An effort is being made to remove all nuclear safety blanks (NSBs) in H Canyon and installing blind flanges to create an air gap. An air gap provid…
Non-slip matting will be installed on sample platform walkways at sample location FM-H1 on Crouch's Branch.…
The DWPF 291-S Zone 1 Stack Continuous Air Monitor (CAM) is comprised of a KURZ isokinetic sampler and VALTEC MOD V radiation monitoring system. Th…
Upgrade four obsolete S-Area/DWPF airborne radioactivity monitors located in 221-S on the Mezzanine Level. These four existing monitors will be con…