Replace H-Canyon exhaust time delay relays that have shown to be inconsistent and unreliable.…
Carbon steel coupons exposed to playground sand will be analyzed for corrosion. Vapor corrosion inhibitors will be added to the sand to evaluate th…
A Subcontractor will pick-up, transport and install 1 new trailer at 711-14N.…
731-6N Repair roof overhang. …
Install a Vehicle Ramp to Parking Lot at Trailer 704-74F…
Remove 249-H Refrigerant Storage Transfer System and remove electrical connections from out-of-service (OOS) Refrigerant Recovery Tank outside of 2…
The 249-H stairwell R-22 heatpump will be replaced with a R-454b heatpump.…
Rainwater accumulates in the containment dike of the 782-2M Purge Water Disposal Station (PWDS) tank. Currently, rainwater is pumped back to the PW…
This activity involves R and D of the generation, collection and analysis of aerosolized particles. The generation and analysis of the particles is…
The work for this project is being completed under FY25 LDRD-2025-00220 Project, Achieving Systems-Level Full Potentials in Sustainable Bioenergy. …