Install new ice maker at 710-14N. Install insulation around domestic water line. D and R overhead light and replace light switch with receptacle.…
TMO will assist Engineering in performing an internal inspection of the inside of the 296-H stack.…
The purpose of this activity is to produce silver exchanged zeolite materials for gas separation R and D activities.…
Gas chromatographs (GCs) are used to analyze non-hazardous samples and to evaluate column packing materials.…
Desorption of analyte gas samples from molecular sieve by heating in an oven and flowing helium gas through the adsorbent to flush the sample out.…
Sealed glass ampoules of Aluminum hydroxide and oxyhydroxide will be irradiated in order to generate small quantities of hydrogen gas. The gas will…
Install Wi-Fi in 742-A.…
Remove and replace 9,200 ft linear feet of fence line around the SRS property boundary located at three bridge crossing locations in the SRS Tail A…
Install additional Laser welder in Bldg. 766-H for the Manufacturing Technology Center (MTC). …
The Loading Line 3 needs upgrades to improve availability and maintainability, improve loading capabilities, provide performance margin and flexibi…