Install WIFI at 735-2B.…
Update all lighting fixtures to LED throughout the facility at 716-N.…
The scope of this activity will be to install blanks to Vessel 6.8E and 7.7E for cooling water and steam at 221-H. Blanking cooling water and steam…
Operation and maintenance of the LECO Carbon/Sulfur. This method determines the concentration of carbon/sulfur in small lab samples.…
Venting gas cylinder bottles for the disposal of lecture bottles thru recycling in A-Area hoods.…
Prep and apply Cool Seal to roll-up doors 1 and 2 at 705-C.…
Generators for use greater than 12 months to be added as insignificant activities.…
At the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit (OU), one existing monitoring well (CMP 50B) has been determined to be compromise…
Maintenance will replace the packing material in the M-1 Air Stripper Column.…
Evaluate, correct, and overhaul chiller No. 2 and return to normal working conditions in HB-Line.…