Excavate to obtain a soil sample from underneath the catch bucket at 715-2G Fueling Station, so the analytical results can be made available to Sou…
Remove one Presumed Asbestos Containing Material (PACM) gasket from ABRP well AHT-14. Removal of gasket will allow for maintenance to repair broke…
A new metal-organic framework (MOF) will be tested for removing pertechnetate from a sample of SRS high level waste.…
Preparation of salt simulant solutions as well as cementitious waste forms that are representative of waste forms from SRS and offsite for testing…
SRNL is working to develop technology to perform imaging of processes conducted at the Savannah River Site. In this task we will perform imaging o…
Excavate to replace the defective domestic water valve DW-V-40 in H Area near 284-19H. Valve has failed between open and closed. …
Replace bearings for on chilled water at 285-11F. The presumed asbestos containing material (PACM) gasket material at the flanges will be removed.…
Replace the tile flooring in the 701-1K Vestibule.…
Excavate to correct the domestic water supply line leak at MOX Concrete Batch Plant.…
The planned work scope is for the removal of floor tile and mastic known to contain asbestos in Room 54 of Building 713-N. Dispose of asbestos con…