On Saturday, May 4, 2019, the fire water line west of 221-H South Dock failed. A sink hole was created by the water flow which caused a bollard to…
The DE vessel installed in Room 17 Diffuser System had two of four heater elements fail. In efforts to continue production, the remaining two heate…
Remove two presumed asbestos containing material (PACM) gaskets from Totalizer at Recovery Well 2 to allow for routine maintenance.…
Remove presumed asbestos containing material (PACM) gaskets from flanges and conduct maintenance on #2 Service Water Pump.…
Remove insulation from valve in 235-F Steam Station to replace valve. …
782-2G Correct and replace domestic water pressure regulator valve to E-Area PCV-002.…
Removal of asbestos containing floor tiles and acoustic ceiling tiles.…
Replace well water valve WW-V-074 at 285-H.…
Building 704-20N is a double-wide trailer that was used as an administrative office for radiological control operations personnel. The building's …
Painting and door replacement activities associated with Building 704-1N.…