Replace Carpet in Room 1059 of Building 766-H.…
A Non-Time Critical (NTC) Removal Action will be conducted for the C-Area Groundwater (CAGW) Operable Unit (OU) TCE plume. The NTC Removal Action w…
Perform cleaning, seal coating, and restriping of parking lot in F-Area. Clean and stripe main parking lot in F-Area.…
The activity includes designing, installing, and operating a new remediation well, similar to the existing remediation well RWM-18, that pumps grou…
Replace Discharge Pump #1 at the 607-1M lift station due to failure.…
This scope of work is to remove any existing material from the three specified expansion joints—one of which lacks any sealant and is cracking—and …
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O&M Plan is not required. These exca…
Adding additional grab ports to the MS3 grab sample manifold.…
Removal of two 1/2"-asbestos gaskets from an Inlet Sample Valve on the Purge Water Tank # 1 in M-Area (M-782002) and replace with asbestos gaskets.…
A High Performance Liquid Chromatography (HPLC) system is used by Analytical Development for organic sample analysis. Sample aliquots injected into…