Replace Temperature Valve in AHU #5 & #6 with insulation/gasket removal and replacement as necessary.…
Building 233-H P-Evac Hydride Bed Replacement…
Upgrade lighting to LED as current bulbs expire.…
Construction will remove and replace the bent gutter on North Side of Low Activity Waste Vault (LAWV).…
Vendor to clean Nurse Tanker SRO# 0148.…
Valve FE-2301 (H-264002-EXTR-HV-138) will be replaced with a like-for-like valve; however, the new valve will have an additional functionality of a ma
Improve work conditions inside 511-S for outage and project construction activities supporting the Salt Waste Processing Facility tie-ins by instal…
Paint the wall as you turn right off the elevator on the 2nd floor from corner to corner. The paint should match the color that is currently on the…
The DCF will update a TCVG indicator from an obsolete model number to a new model supported by the vendor (Teledyne Hastings Instruments). The pre…
Remove and replace carpet in rooms 569, 570, 567, 566, 565, 564, 563, 562, 598, 597, 596, & 572. Rooms 596, 597, & 598 will have asbestos tile to …