NDE Inspection of the DBCF underground piping. The piping is approximately 7 ft below grade.…
Determine Solubility and Vapor Pressure of Monomethyl Mercury in Tank Waste Simulants Using Milestone Direct Mercury Analyzer (DMA-80).…
Subcontractor will provide assembly and disassembly roof repairs at Building 105-L. The subcontractor "will not" disturb the existing roof while p…
Materials Science group is in need of services for operating a Helium Leak Detector inside A-773000-OGE-GB-34. The leak detector will be used in s…
Subcontractor will provide renovations to 773-A, outside entrance canopy and surrounding area.…
Project Management & Construction Services (PMCS) will be installing a new electric plant air compressor near Building 725-2N.…
Install new conduit and transmitter/receivers in the K-Area Reactor building for system enhancements.…
The goal is to develop and demonstrate high density stainless steel pellets or pucks containing surrogate materials for plutonium oxide embedded wi…
A subcontractor designed and constructed a permeable reactive barrier (PRB) in the subsurface to intersect volatile organic compound (VOC) contamin…
Replace the 50 ton chiller (T948-500-10) located inside of Building 249-H…