Remove existing temporary scaffold-style handrail and replace with a permanent handrail.…
The proposed activity (PA) is for the design/implementation of DCPs, see below, and the migration to M580 Hardware, see CMTs below, for PCMs 0-5, a…
At the Scrap Lumber Pile 631-2G a DPT rig will collect soil samples to a depth of 10-ft at 19 locations. At the Ford Building (690-N) 27 hand aug…
Remove insulation from valve 806, so that packing can be adjusted. Valve is located in front of 736-A, SRNL.…
The existing cubicles are original to the 730-B facility and have reached the end of their design life and will be replaced.…
CX-020017: K-Area Electronic Safeguards and Security System (E3S) Replacement & Argus Implementation
This modification will replace E3S in K-Area with the Lawrence-Livermore National Laboratory (LLNL) Argus Security System.…
Boiler preventive and corrective maintenance (PM/CM) on 735-1B Hot Water System, including removal of presumed asbestos containing material (PACM) …
Replace wooden steam line support brackets with steel brackets in various locations in A-Area.…
A Storm Water Visual Assessment Sample Holder (a.k.a Kremlin sleeve) is to be installed at outfall S-10A. …
Reroute Domestic Water underground piping around Trailers 704-62S and 704-63S.…