The planned work scope is for the removal of floor tile and mastic known to contain asbestos in Room 54 of Building 713-N. Dispose of asbestos con…
Office of NEPA Policy and Compliance
April 23, 2019The planned work scope is for the removal of floor tile and mastic known to contain asbestos in Room 54 of Building 713-N. Dispose of asbestos containing material per Asbestos Disturbance Notice. Clean and apply concrete sealer to slab floor.