Replace bearings for on chilled water at 285-11F. The presumed asbestos containing material (PACM) gasket material at the flanges will be removed.…
Office of NEPA Policy and Compliance
April 23, 2019Replace bearings for on chilled water at 285-11F. The presumed asbestos containing material (PACM) gasket material at the flanges will be removed.