The scope of this task will replace the diesel engine and generator and consolidate and/or replace the existing 4 Motor Control Centers (MCCs) in R…
Prep and paint pump skid at Waste Solidification Building (WSB).…
Five office trailers, one bathroom trailer and one handi-house in L-Area will be removed and replaced.…
Safely remove from SRS property trailers 772-29G, 782-5G, and 782-10G. Safely demolish SRS property trailer 782-13G. Demolished trailer will be di…
Isolate the KAC Cf-252 Shuffler, Shuffler Instrumentation Cabinets, and Shuffler Room lighting and receptacles from all Electrical Power Sources an…
Replace the tile and carpet in the 105-K Personnel Wing Ladies Restroom and Locker Room.…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer model…
Install compressed gas cylinder bottle rack outside of K-Disassembly Basin, 105-K…
Work will include replacing some ceiling tiles, fixing holes in walls, painting walls and doors, and fixing/repairing the cove base. No asbestos c…
A single partial can of Leak-Tec 72V was found during a review of the gloveboxes as part of the facility lay-up preparations. Waste removed from t…