Replace the ultra-violet disinfectant system at the effluent of the Central Sanitary Waste Treatment Facility (607-74G). …
This activity will study and develop the process conditions and equipment to calcine up to 1 liter batches of DGA resin in support of the Mk-18A pr…
Remove existing carpet, tile and mastic, abating asbestos and installing new carpet flooring within designated areas of Section A, Building 773-A.…
Measurement of hydrogen generation from SRS Tank Farm actual-waste samples at a series of temperatures with and without addition of glycolate.…
Fabrication of scientific glassware and apparatus for SRNL and SRS as needed. …
Crush and run will be applied to level the access path to Sampling Point PB-3 off of Highway 125.…
Subcontractor will provide roof repairs at 617-11G. The Subcontractor will disturb the existing roof while performing these repairs on 617-11G. The…
This EEC is for the placement and implementation of the N-Area Temporary Asbestos Storage Containment Area. This will involve receipt, storage, an…
Valve and presumed asbestos containing material (PACM) gasket removal and replacement at H Base Injection.…
The Savannah River Site Community Reuse Organization (SRSCRO) shall furnish labor, material, equipment, tools, PPE, and supplies necessary to perfo…