It has been decided to generate a DCF to replace the Cuno filters with Porvair filters (formerely Fairey Filter Elements).…
Relocate PA amplifier from 701-1C to 704-C.…
Design and install a new DIMS to be installed in Room 28.…
766-H life safety measures-Penetration seal work.…
Subcontractor will provide roof repairs at 713-2N.…
Create various blends of powder and aggregate materials for use in other projects to support K-Area and HB-Line.…
Inspection and treatment of all the wood poles (data, mechical, electrical) within the fence line of the Tritium Area per C-SOW-G-00038 Rev 2.…
The Auger instrument is used to analyze samples.…
Abrasive blasting steel structures for coating applications performed by construction forces in the 725-2N Blast Building/Yard.…
Repair ATTA Range Ballistic Wall that was damaged during recent severe weather.…