Replace all exterior light fixtures on 233-23H and 233-24H with LEDs.…
SUD/Construction to paint air release valves on the river water system. Scopes include cleaning, prepping, and painting.…
SUD to paint various equipment sitewide. Scopes include cleaning, prepping and painting. …
Paint Rooms 243, 244, 334, 336, and 337. Replace carpet in Room 243. Activities will occur in Building 730-B.…
Install a new chain link fence for the switchyard at SCE&G substation 72 (751-B).
This Laboratory Directed Research & Development (LDRD) is designed to evaluate the viability of a self-propagating synthesis method to stabilize an…
Fourier Transform Infrared (FTIR) uses a beam of infrared light to analyze a sample in a non-destructive manner. The samples are returned to custo…
This activity is ongoing and involves the operation and maintenance of an Ion Chromatography (IC) system(s) in 773-A B-134 containment units CHEX h…
This EEC covers all Site Services preventative and corrective maintenance work that has the potential to disturb presumed asbestos containing mater…
Pursuant to encouraging results from the 2013/2015 Aerobic Bio-stimulation bench scale study using humate to treat Southern Sector groundwater cont…