The Cyberex Inc Rectifier-Charger Model 130/106R3 is being replaced with the Hindle Power Station Float Battery Charger in Building 108-2K.…
This Scope provides the labor, material, and services to install additional personnel office space and restroom for supporting new missions in K-Ar…
Chiller #1 is an air-cooled unit which requires periodic coil cleaning. The Site Stormwater SME has received approval from SCDHEC for release of c…
Proposed activity covers those actions associated with cleaning and maintenance of lasers and associated optics owned by AD at SRNL (A Area).…
Subcontractor will provide roof repairs at Building 717-12F. The Subcontractor will not disturb the existing roof while performing these repairs on…
This proposed activity will repair damage to the 221-H roof in an HB-Line storage area resulting from scaffling being blown over during a storm eve…
The Sikaflex sealer in the joints at the Heavy Water Component Test Reactor (HWCTR) have degraded. The existing material will be removed via wire w…
Soil Neutralization Amendments for the D-Area Coal Storage Area…
A treatability study will be performed to inject natural artesian groundwater from two nearby production wells in D-Area into the upper water table…
Site Infrastructure personnel perform recycling activities for Universal Waste Batteries from various locations at SRS.…