Remove and replace 922 Condensate Tank Pump A in -20 of 105-L.…
Re-coating and re-lining of 2-inch and 4-inch sewer lines beneath Building 235-H.…
Site construction will prep and paint the exterior of the 735-B Stack and the associated fiberglass exhaust duct.…
Construction personnel will repair floors, walls, and ceilings on the 4th Level of H Canyon as specified in the referenced work orders.…
Subcontractor will provide roof repairs at 248-H.…
SRNL will perform experiments aimed at developing single crystals of novel and known actinide complexes.…
Abandoned fuel oil heater at 725-2N will be removed and disposed of at the scrap and salvage yard.…
Two (2) abandoned fuel oil heaters at 725-1N will be removed and disposed of at the scrap and salvage yard.…
Main Feeder Utility Pole Treatment requiring soil disturbances within the A and SRNL Technical Area…
Inspection and treatment of utility/power poles in the H-Area (Canyon, HTF, General, ETF) and S/Z/J-Areas.…