The Building 250-S roof is to be replaced.…
Room 169 is being modified to accommodate office spaces throughout the room, resulting in deficient notification device coverage as required byNFPA…
Replace the packing in Return Pump #3 at 281-2H.…
Building 616-G has reached an end state and will be demolished.…
Subcontractor will provide roof repairs at 704-16B.…
Augusta Industrial to pressure wash internal cooling tower basins at 785-1B and 785-A.…
Install backboards in phone room in 722-A.…
Scope of this work is to repair, reroof and recoat some of the roofs of buildings 234-H and 249-H.…
Upgrade 254-5H Diesel Fuel Level and Leak Detection System with a Pneumercator Level and Leak Detection System.…
Soil Neutralization Amendments for the D-Area Coal Storage Area…