Remove 252-9H Substation northwest of Building 232-H in the Tritium facility. …
Disconnect and remove electrical cables and fuses from 125V Distribution System in 108-2L.…
Remove Research Reactor Fuel Counter II (RRFC II) and associated equipment from 105-L Disassembly Basin.…
Project Y-757 replaces E3S with the Argus Security System for components not already identified by Projects Y-738, Y-732 and Y-724 in the Tritium F…
Remove and reinstall pressure relief valve SW-PRV-001 at 681-3G Pump House #3.…
Replace carpet in Building 751-1A, Room 17 using standard blue carpet squares.…
Perform cleaning, seal coating, and restriping of parking lots in A-Area, B-Area, C-Area, and N-Area.…
The contents of the 607-18A Trade Waste Tank will be removed, and the remaining sludge of silver will be recycled as a precious metal rather than d…
This is a treatability study to mitigate glycolate in real DWPF sample liquid material with added Slurry Mix Evaporator (SME) slurry. …
Tile removal and replacement in 105-K Personnel Wing, Room 1013.…