Correct/recoat phosphate chemical dike at 782-3A.…
A subcontractor will design and construct a permeable reactive barrier (PRB) in the subsurface to intersect volatile organic compound (VOC) contami…
Building 704-20N is a double-wide trailer that was used as an administrative office for radiological control operations personnel. The building's …
Perform cleaning, seal coating, and restriping of 717-K NW Parking Lot.…
Install metal/cork strips around Room 76 in Building 707-F.…
McQuay Chiller #1 is an air-cooled unit which requires periodic coil cleaning. The Site Stormwater SME has received approval from SCDHEC for relea…
Evaluate and repair crane solenoid and breaker that is intermittently tripping on low lift crane at 681-3G.…
Installation of D-Area groundwater monitoring wells for data collection. …
Install sidewalk and replace damaged stairs at Building 226-2F.…
Remove presumed asbestos containing material (PACM) gaskets from flanges and conduct maintenance on relief valve PSV-012 (Pressure Safety Valve).…