Fabricate and install an aluminum cover over existing well northwest of Trailer 247-19F.…
Remove Pipe Insulation from Battery Room 100 in Building 772-7B.…
Construction will take an asbestos sample from electrical enclosures in the 4th Level Control and Hot Gang Valve Corridor…
Analysis of water samples using liquid scintillation spectrometry.…
This Scope provides the labor, material, and services to install additional personnel office space and restroom for supporting new missions in K-Ar…
This EEC will cover pH, conductivity, and deuterium by FTIR methods as they apply to the analysis of basin water samples from K and L areas. This a…
This activity involves transferring an old office trailer to the SRSCRO and replacing it with a new trailer.…
Replace 914 Fan and 902 Fan Steam Condensate Quench Tank in K-Area…
The proposed action is for the closure of two underground storage tanks.…
Preparation work on TRU Pad 4 for installation of Non-Destructive Assay (NDA), Non-Destructive Evaluation (NDE), and Flammable Gas Analysis (FGA) e…