Replace the airtrol tank fittings on the furnace 1 and 2 cooling water expansion tanks with a designed fitting using swagelok parts.…
Install an automatic transfer switch (ATS) to provide two different sources of electrical power to lighting panel PNL PP1 in Building 703-44A.…
233-H Tritium Air Monitoring Sample Point valve K-51 M-R1 will be removed and blank pipe flange installed.…
Run new conduit and conductors from disconnect.…
The current TEF FORMS Monitor Cabinet utilizes an obsolete DOS based operating system PC for its control functions.…
The HANM Classified D/3 DCS 16000 I/O modules in PCM-13 that interface with field instruments and controls have exceeded end of life.…
This activity involves the removal of a bead blaster machine from 716-N.…
This EEC covers the operation of the AccuTOF-DART time-of-flight mass spectrometer…
The objective of this project is to determine vegetation's physiological response to metal exposure and other chemical and physical stressors.…
Install new handi-house (663-62G) to replace 663-34G, which will be relocated offsite by the SRS Community Reuse Organization (SRSCRO).…