Install voice only drop in Building 766-H.…
Several passive fire protection features in Building 233-H have deficiencies which could potentially degrade their performance in the event of a fi…
Unplug Steam Line 773-A, C-006…
719-5N Prep/replace flooring.…
Repair and replace windows at Building 725-N.…
This task includes preparation of a simulant of a high salinity waste stream at the Fukushima Daiichi Nuclear Power Plant followed by testing of de…
This study aims to evaluate the mercury (Hg) and hydrogen gettering and retention abilities of metal catalyzed inorganic substrates, in support of …
This activity will investigate the effects of various processing conditions (heat, hydrogen, air) on vacuum oils.…
Sphincter seal assemblies have been proposed for introducing blend cans and shield cans into gloveboxes for use in the downblending process of surp…
A decision was made to permanently cease operation of the TRS.…