704-1N carpet replacement.…
The EEC covers the renovations for the interior of building 713-1N.…
This EEC covers all maintenance work performed by SRNS Organizations on steam lines located at SRS.…
Subcontractor will provide roof repairs at 249-H.…
Subcontractor will provide roof repairs at 705-H.…
Piping will need to be removed and worked to fit the new filter. Some piping components will be replaced.…
Seven (7) data lines will be installed in room 422 of 105-L.…
Apply roof coatings and seal roof leaks.…
Temporary Modifications (Temp Mod) 264H-TMC-19-270 and 264H-TMC-19-271 utilize tubing, regulator, PSV, and associated fittings to provide a bypass …
The PA is to remove a thermally actuated valve that is currently integrated into the fire suppression system (FSS).…