The proposed action is to remove and replace existing roofing systems on Building 221-F Truckwell.…
The scope of this task will replace the diesel engine and generator and consolidate and or replace the existing 4 Motor Control Centers (MCCs) in R…
The purpose of this activity is to perform gate checks and clear weeds and other debris from the conduits at Par Pond Dam and Steel Creek Dam (L-La…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
Repair SW Valve No. 10 at 681-3G.…
EEC covers the Real Estate Lease, siting, construction, utility installation and operation of the Verizon-SRS ll Cell Tower and appurtenances adjac…
At the Aviation Operations Department, a fuel drip has developed. An absorbent pig is located within the fuel pit and is absorbing the drip. The dr…
Two plastic 3D printers will be operated inside 723-15A.…
Renovate Lab C-130 in Building 773-A to provide a modern laboratory space with a large radiohood located in the center of the room.…
This EEC covers the installation and operation of an autoclave, Model SSR-3A-ADVPB in Building 607-17A.…