This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O-M Plan is required.…
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O-M Plan is not required.…
Subcontractor will provide roof replacement at Building 701-2L.…
Pump Corrshield MD4100 into Chilled Water Loop at 789-2B.…
SRSCRO will dismantle and remove D Area Metal Buildings including 484-15D D-Area Storage Building, 683-D Chlorine Building, ...…
Subcontractor will provide roof repairs at 773-63A. The Subcontractor “will not” disturb the existing roof while performing these repairs on 773-63…
A new metal-organic framework (MOF) will be tested for removing pertechnetate from a sample of SRS high level waste…
Replace floor tile in building 713-1N, Section A1, Corridor 2 hallway between offices N321 and N204.…
Prepare gravel parking lot and laydown area north of Construction trailers in K-Area.…
Replace bearing packing on outboard bearing for electric fire pump 003 located at 902-3H.…