Remove portions of existing guardrails, conduit, and conduit support, and remove ladder on 249-H.…
Subcontractor will provide roof repairs at Building 703-10B.…
Implement modifications to Building 751-1A that include drilling into transite to mount photoluminescent exit signs and to relocate an electricalre…
Generate trace level dimethylmercury gas standards using a permeation tube and a Kintec calibration gas generator system.…
CO Monitor Calibration/PM of the Compressed Air Purification System in 108-1L…
Install Portable Heaters and Diesel Generators to Provide Temporary Heat For Y708 Project Tie-Ins…
Install riprap on the upstream slope of Par Pond Dam between the existing riprap and the guard rail. …
Remove receptacles and non-load-bearing wall, repaint walls, and replace carpet and baseboards in Building 773-63A, Rooms 10 and 11.…
This EEC covers all Site Services preventative and corrective maintenance activities that have the potential to disturb gasket materials.…
This EEC covers all Site Services preventative and corrective maintenance work that has the potential to disturb presumed asbestos containingmateri…