This EEC is written to cover characterization work associated with salt batch qualification samples.…
Subcontractor will perform roof repairs on Building 218-1H utilizing a Hydro-Stop system which includes foundation, fabric, and a final coat.…
Aqueous corrosion testing is performed for numerous materials in solutions composed of an array of chemicals.…
These two methods determine the concentration of oxygen/nitrogen/hydrogen and carbon/sulfur in various materials.…
Project Management & Construction Services (PMCS) operates an insulation fabrication shop at 717-10N.…
Construction personnel will renovate the interior of Building 701-1H.…
Install a new laboratory hood in Building 773-A, Lab B-147 and 151 along with two Spectrometers and supporting services.…
There is a need to set up three washing machines outside of 719-H in the Ambulance Bay.…
Re-caulk windows at the southeast and northeast corners of 730-B.…
Remove designated areas of crusher run and replace with asphalt.…