Subcontractor will provide roof repairs at 704-H.…
Replace carpet, tile, and cove base in 705-C.…
Subcontractor will provide roof repairs at 790-4B.…
The oil-filled windows for Building 773-A Shielded Cells 7, 9, and 13 are in need of replacement due to significant oil leakage, which is causing a…
HRTL Lab 144 (HRTL High Bay) is utilized by the Hydrogen Isotopic Processing Section for the Hydrogen Processing Demonstration System (HPDS.)…
Generator (MG) sets in 251-F are reaching end of life expectancy and require a considerable amount of maintenance.…
Replace damaged ceiling tiles in 736-A.…
Relocate grinder and belt sander to opposite side of MillWright Shop, Building 711-9N.…
Disconnect and remove (3) welding machines currently located in building 711-N.…
Install Unistrut rack and welding receptacle in building 717-1N.…