The sinks in the 704-L Men's Change Room are plugged.…
The 216-L Sump Pump discharge check valves 216-A and 216-H need to be replaced.…
MOX-Termination has determined that portable building SRS-PB-EX-0027 is now excess.…
Apply water-proof coating and sealant to newly installed plywood on top of cell No. 4 on 785-2A, Cooling Tower 2.…
Replace existing propane monitors at Building 754-11A.…
Four characterization soil bores northwest of the M Area Settling Basin to further characterize the high concentration VOC plume.…
This EEC addresses the installation of 12 groundwater monitoring wells and eight injection points ...…
Repair cracking, spalling, detaching of concrete along expansion joints and construction joints of the 221-H concrete exterior walls.…
Until a mission is identified for the facility, HB-Line will be maintained in a layup state.…
Oxidant injection to enhance remediation of chlorinated ethenes-tetrachloroethene, trichloroethene, and daughter products...…