Plants will be germinated and treated with chemicals such as organophosphates and flowering promoters.…
This scope is intended to cover the drying and compression of Calcium Chloride, CaCl2, salts.…
Nitrate salt simulants containing varying water concentrations will be combined with organic, wheat, kitty litter for thermal aging studies in anAc…
A series of non-rad tests will be performed to study the oxidative destruction of glycolate and/or tetraphenylborate containing solutions.…
Construction personnel will remove asbestos insulation in the Hot Gang Valve Corridor and replace with non-asbestos insulation.…
The scope of this work is the extraction of deuterium oxide and singly-deuterated water from water and deuterium oxide mixtures using combinationso…
Install Universal Wiring, UW, in Building 703-47A.…
Construction personnel will seal asbestos insulation on the duct located in the closet of Room 125 - Building 704-H.…
Inspection and treatment of wood 13.8kva Feeder power poles in L-Area.…
Remove building 707-11F and dispose in C&D Landfill.…