773-A, B135 and 139 is a multi-purpose laboratory equipped with instrumentation to process and or analyze liquid, solid, and gaseous samplesutilizi…
This EEC is written to cover solvent qualifications associated with the Salt Waste Processing Facility, SWPF.…
The proposed activity is to replace the roofing systems over 773-A, E-004, 008, 131 and conduct warranty repairs as needed.…
The Materials Compatibility and Welding Technology group presently houses three electrical resistance welding stations, two self contained lowpower…
Inspection and treatment of approximately 414 wooden street and fence Poles in K-Area.…
Inspection and treatment of wood utility and power poles along Burma Road, including ACP, Waste Water Treatment, and other G-Area facilities.…
Install two wall mounted HVAC units, or engineering approved equal, and any supporting electrical outlets or power sources.…
As part of the modified Phase 4 plan for the 288-F Ash Basin Landfill Reclamation Project, this activity will involve relocation of approximately3,…
Removal of asbestos containing material, ACM, and presumed asbestos containing material, PACM, from multiple ancillary buildings in thevicinity of …
Construction personnel will repair floors, walls, and ceilings on the 4th Level of H Canyon as specified in the referenced work order.…