Five, 5, off-specification tritium cylinders will be vented to allow for disposition of the cylinders.…
Replace exterior seals on all thirty, 30, windows in Building 773-52A.…
The project objective is to produce a proof of concept for enhanced mechanical performance and durability of portland cement-based reinforced compo…
Prep and paint walls in Conference Room B, Room H-20, in Building 704-1N. …
Subcontractor will provide roof repairs at-K-Area Assembly Roof and Fan Room.…
Replace and reconfigure cubicles in building 248-H per Design Change Package, E-DCP-H-19008, to allow for additional personnel in the building.…
A subcontractor will remove sludge and or waste water from various sanitary waste water systems at SRS.…
Replace Uninterruptible Power Supply, UPS, number 1 in Building 707-C, Room 117.…
This EEC covers the catalytic testing and disposal of a proprietary iron oxide catalyst that will be obtained from Haldor Topsoe through a nondiscl…
A Bicron Automated Scrap Monitoring, ASM, system will be installed and operated at 713-3N.…