Dominion Energy is installing fiber optic cables on top of 115 kV structures from 151-1K (Station 14) to 151-2C (Station 15-2).…
Dominion Energy to install new guy anchors due to transmission pole work near 751-B (Station 72).…
Install approximately 350 feet of duplex fiber optic cable (OS2-Singlemode (9/125)-Duplex-Fiber Optic Cable-FC to FC) from the EOCProjector Room (E…
This activity is for the potentiometric measurement of uranium (U) content for a wide variety of samples.…
This proposed activity will employ H Canyon's Electrolytic Dissolver to process Fast Critical Assembly (FCA) material.…
Subcontractor will provide roof replacement at Building 722-A.…
This activity involves the determination of Plutonium (Pu) and Neptunium (Np) in aqueous samples via the Control Potential Coulometry methodin 773-…
This EEC applies to the cleaning, cutting and dissolution of Plutonium (Pu) metal.…
Subcontractor will perform roof repairs on Building 218-H utilizing a Hydro-Stop system which includes foundation, fabric, and a final coat.…
Subcontractor will provide roof replacement at 742-A.…