The acetylene service is being air gapped and capped out in 773-2A in order to comply with new calculations for flammability and explosives ...…
Prepare and measure rheology of H canyon samples.…
This activity scope includes the installation, operation and maintenance of a Thermotron DSX-6650 vibration system.…
K-Area public address system in 704-K (War Room) and 701-2K (Command Area) will be upgraded.…
The purpose of this activity is to prepare soil samples containing known amounts of silver.…
Stream surveillance location FM-A7 is part of the routine monthly stream surveillance sampling program on Four Mile creek.…
The focus of the temporary modification is to keep the 232-H backup Exhaust Fan A (53.004-A) available in case of failure of Exhaust Fan B(53.005-A…
Tritium Extraction Facility (TEF) Open Glovebox Maintenance on GB 3000 to rebuild GB recirculation blowers.…
Location PB-3 is part of the routine monthly Radiological Stream Surveillance Program on Pen Branch.…