Repair and replace pipe hangers and replace rusty firewater piping in the 772-F laboratory on the service floor.…
Backup of sewage in building 706-6F occurred on March 26, 2020.…
Refurbishment of Building 706-2F includes numerous construction activitites.…
Refurbishment of Building 706-1F includes numerous construction activitites.…
Operations or STR will access and repair the line and decontaminate sewage as necessary.…
The objective of this task is to observe the effects of hydrogen charging at various temperatures.…
Prepare H-Canyon Outside Facilities samples for metal impurities analysis ...…
Replace the ultra-violet disinfectant system at the effluent of the Central Sanitary Waste Treatment Facility (607-74G).…
Construction of an approximately 65,000 square foot facility consisting of wet chemistry and various mechanical laboratories and including a highba…
Subcontractors will repair the roof on Building (Trailer) 221-24H…