Maintenance and Operation of transmission electron microscope, for example, the TEM in 773a c104.…
Installation and Operation of a R&D Vacuum Furnace in Building 723-A.…
Building 773-50A is currently being renovated for the installation and operation of a Techni Abrasive Waterjet Cutting System.…
The project objective is to produce a proof of concept for enhanced mechanical performance and durability of portland cement-based reinforcedcompos…
This work will replace existing HVAC systems located in building 735-7A due to the age and the condition of the equipment.…
The Inert Metalography Laboratory Tritium Recovery System (IML TRS) is no longer operational and permanently out of service.…
Installation and operation of a Stand Alone Gas Dilution Manifold in 234-H, room 267 to support development of low concentration tritium gasstandar…
Excavate to correct the underground domestic water leak Southeast of 281-15H…
The ICW Booster Pump and motor need to be replaced due to age.…
The outdoor Motor Control Center (MCC) requires replacement due to age and cost and availability of replacement parts.…