Testing is to be performed to evaluate possible pluggage of dip legs used in various tanks on site.…
This EEC will cover operation of the Raddec Pyrolyser Combustion Furnace.…
As part of a strategic Lab Directed Research & Development, aerosols will be generated and allowed to collect on a variety of substrates.…
Since 1999, the Nonproliferation Technologies Section (NTS) has established and maintained inorganic mass spectrometry laboratories for theanalyses…
Replace Valves SCW-V-4501 and 4500 at K-Area Assembly Area, and associated insulation.…
C. E. Bourne Subcontractor 00000611 will provide roof replacement at 766-H.…
Prep and paint the 614-20G A Area WIND tower and the 614-21G D Area WIND tower.…
Replace existing GFCI circuit breakers number 38 and number 40 in 701-20G…
Repair platform at PB-3 stream sample station platform.…
Renovations and modifications in building 711-1N.v…