Replace damaged and loose carpet with carpet squares to match carpet previously replaced in other areas of the building on all three floors.…
Replace the area velocity flow sensor in the culvert at liquid effluent outfall F-05.…
Remove and replace floor material and ceiling tile in specific rooms in 701-1L.…
This activity will be to develop a method to characterize the synthesis of Palladium particles from a palladium precursor.…
Replacement of Area Velocity Flow Sensor at Stream Surveillance Location FM-A7…
A new domestic water well will be installed for the Barnwell Barricade.…
Replace carpet in IT Area in 730-4B 1st Floor.…
SRNL will determine the moisture retention properties of various formulations of cementitious materials that are representative of SRS and offistew…
Air gapping of mechanical lines to isolate building 236-H.…
The activity consists of flowing Ar or N2 through a packed bed of porous zero valent iron (p-ZVI) to measure the pressure drop across the bed.…