Replace steps and decking at 235-11F.…
Push 3 CPTs down to lower part of Lower Aquifer Zone (LAZ) for lithology.…
Install WI-FI in 730-2B Room 204.…
Remove and replace drywall in areas affected by the flooded floors in Buildings 730-1B, 730-2B, 730-4B, and 703-1B.…
Install VTC in room 344 of 730-1B.…
Install additional 120V receptacles in Rooms 106, 107, and 185 of Building 703-47A.…
Install a 250V, 20A, NEMA 6-20R receptacle with cover plates in room 126 of 773-52A.…
This project includes taking soil samples at the H, K, and L-Area Ash Basins, and conducting visual inspections for ash along transects todelineate…
704-C paint exterior of building, windows, and doors.…
A new air compressor was installed on the existing air compressor pad on the west side of 217-3H in early 2019.…