This EEC supports the installation of a pre-fabricated "Butler" style building to serve as the SRNL Construction Shop per the design input document…
Install Handi-Houses (approx. 3) outside and south of Assembly and outside and west of Disassembly in K-Area.…
Electrical enhancements at 741-2N for CCO Storage Pad systems testing, primarily to supply/upgrades for electrical demand/need.…
Janitor's closet enhancements to be done in 704-K.…
Subcontractor will provide roof repairs at 770-A with addition of Hydro-Stop coating.…
General chemical and nanomaterial research support for Material Science and Clean Energy projects will be performed in various labs at the Applied …
HTRL Labs 133 and 134 are laboratories used by the Hydrogen Isotope Process Science Group for hydrogen related research and development activities.…
704-S Rooms 78, 80, 82, 83, 83A, 83B, and 85 will be remodeled to function as stand alone offices with work to include framing, drywall repair and …
This scope of work covers activities associated with the development of electrolytic cell and catalyst reactor components for projects such as sulf…
MOX-Termination has determined that portable building 149 is now excess.…