This activity is to prepare and relocate various equipment from the MCA to off-site and on-site recipients.…
Relocate chiller to new location, inside Temporary Construction Opening (TCO) across from B209 inside Building 226-F.…
Proposed activity will reconfigure and remodel 226-2F to support use as a training and operations support facility.…
This activity will study and develop the process conditions and equipment to calcine up to 1 liter batches of DGA resin in support of the Mk-18A pr…
Approved herbicides, targeting Bahiagrass, will be applied inside/around various facility boundaries and on roadside/utility right of ways.…
CX-021052: Remove Two PACM Gaskets from F Base Injection Flow Indicator Transmitter (flange) FIT-170
Remove two Presumed Asbestos Containing Material (PACM) gaskets from Flow Indicator Transmitter (CIS-FIT-170) at F Base Injection.…
Four monitoring wells near the perimeter of the Mixed Waste Management Facility need the current deployed submersible pumps replaced with low flow …
Dispose of HEPA/Pre-filters to N-Area form IH Hood used to analyze potential asbestos samples.…
Sampling crew will Collect 1” x 18” sediment cores and surface water samples from the Steeds Pond Soil Contamination Area.…
This proposed activity will renovate men's and women's bathrooms on the fourth level of H Canyon.…