Subcontractor will provide roof repairs at 735-7A.…
Subcontractor will provide roof repairs at 723-A.…
Remove lead acid batteries from 3 installed UPS systems battery cabinets and disposition battery cabinets as scrap metal.…
Replace the airtrol tank fittings on the furnace 1 and 2 cooling water expansion tanks with a designed fitting using swagelok parts.…
Install a blank on Duct 7902 in 233-H Room 10 supply register.…
233-H Tritium Air Monitoring Sample Point valve K-51 M-R1 will be removed and blank pipe flange installed.…
The current TEF FORMS Monitor Cabinet utilizes an obsolete DOS based operating system PC for its control functions.…
Install an automatic transfer switch (ATS) to provide two different sources of electrical power to lighting panel PNL PP1 in Building 703-44A.…
Run new conduit and conductors from disconnect.…
The HANM Classified D/3 DCS 16000 I/O modules in PCM-13 that interface with field instruments and controls have exceeded end of life.…