Provide seismically qualified SC Fire Barrier between 233-H and 233-1H in room 40, 41, and 42.…
Replace No. 002 Cooling Water Return Pump/Motor located at 281-2H…
Tritium Extraction Facility (TEF) Open Glovebox Maintenance on GB 3500 to replace GB recirculation blower motors with new 15 hp motor design and re…
704-N Remove wall between rooms 12A and 12B.…
The Stratasys Rapid Prototyping Machine was purchased to support research and development. …
Kitchenette enhancements to be done in 704-K Room 14.…
Reroute condensation drainpipe from Air Handling Unit (AHU) catch pan on the second level of 713-1N (northwest corner).…
The adsorption of different gases (hydrogen, oxygen, neon, argon, krypton, xenon) on metal particles (silver, gold, copper, palladium, platinum) an…
Remove Asbestos Presumed Asbestos Containing Material (PACM) gaskets, then remove leaking valve RWW-101 and replace with new valve, reinstall insul…
This project will provide a new exhaust system (2 Fans), a small electrical building, a stack, and a new diesel generator for 234-7H and will blank…