This EEC covers the testing and disposal of a propietary ZAO Non-Evaporative Getter (NEG) that will be obtained from SAES Getters through a nondisc…
Establishment and operation of a Rapid COVID Testing Station outside of 735-4B.…
Dismantle and remove 210-S Control Room Chiller No. 1 (EN/EP No. S-210-580-010-00) and 210-S Control Room Chiller No. 2 (EN/EP No. S-210-580-015-00…
The obsolete recloser on B Feeder is reaching the end of its life cycle and need to be replaced…
707-F Patch sheetrock/repaint rooms 6 and 8.…
Modifications to receptacles and panels in Building 702-A.…
This DCF is replacing HPN-PIT-3 and LPA-PIT-3 with new pressure transmitters and removing wireless transmitters that are beginning to fail.…
Install additional roof security barriers to the Main Tritium Entry Control Facility (Building 701-3H).…
Old lathe will be dismantled and removed from Section 7 of the IML Glovebox. …
904-43G Pressure wash/touch up paint Hooterville Fill Station. Safety yellow areas have faded due to normal wear and exposure to weather…