Create an asphalt floor and entry/exit to quonset hut in the gravel lot north of the KAC main parking lot.…
Install an Electric Discharge Machine (EDM) in building 234-H that requires a chilled water unit, electrical supply, instrument air supply, de-ioni…
Perform repairs to the interior of Building 705-N.…
L-Basin High Flux Isotope Reactor (HFIR) Fuel Resin Cleaning Stations…
Until a mission is identified for the facility, HB-Line will be maintained in a layup state.…
Install electrical power and sample tubing for SRNL Monitoring Trailer.…
B-6 RCL Waste Container Material Inspection / Retrieval per procedure 233-52196.…
Construction of pre-engineered metal building for the US Forest Service, including water, sewer, electrical, and communications tie-ins to existing…
This task will remove and replace asbestos tile, cabinets, and ice machine. Construction personnel will also paint and repair walls in Building 703…
Installation of a Stand Alone Gas Dilution Manifold in 234-H, room 267 to support development of low concentration tritium gas standards.…